Monday, April 03, 2006

Week 1

NOTE: The dates on the post were changed to keep the pictures in chronological order

Last updated: April 10, 2006

Summary: We took the car and transfered it from Stryker, OH to Edgerton, OH. Once we got to edgerton we jack the car up and evalutated the situation under the car. We began by cutting out holes in the trunk to where we would mount the box steel sleeves for our hydraulic cylinders. We made brackets that would fit near the holes in the top of the trunk and the bottom of the unibody frame. We then used threaded steel rod to sandwich our brackets between the frame, giving us a solid mounting point for our box steel sleeve. This also reinforced the frame. By the end of the weekend we accomplished on both sides cutting two holes in the trunk, reinforcing the frame, and tack welded the outside box steel sleeve in place.

Moving the car from Stryker, OH to the Al's work garage(Edgerton).
Free Image Hosting at

On the trailer ready to go.
Free Image Hosting at

Parked in the ol' Toyota to get the project going.
Free Image Hosting at

Taking a look under the trunk to see what we have to work with.
Free Image Hosting at

Finally realizing this won't be as easy as planned.
Free Image Hosting at

Cutting the first hole.
Free Image Hosting at www.ImageShack.us

Cutting brackets to length.
Free Image Hosting at www.ImageShack.us

Finishing up the brackets.
Free Image Hosting at www.ImageShack.us

Cutting some steel rod used to sandwich brackets together.
Free Image Hosting at

Brackets installed and mocking up the outside steel sleeve.
Free Image Hosting at www.ImageShack.us

Bottom bracket sandwiched between the unibody frame.
Free Image Hosting at www.ImageShack.us

Bracket installed and steel sleeve tack welded into place.
Free Image Hosting at www.ImageShack.us

Al in uniform.
Free Image Hosting at www.ImageShack.us

Our only foul up so far. A piece of metal that was rescently torched off a bracket was laying on the ground and then an extension cord happened to place itself on the hot scrap steel. POP!! It blew a breaker and we all had a chuckle. The cord is currently tied in a knot in a corner where it will probably never get fixed... ;)
Free Image Hosting at www.ImageShack.us

2 Comments:

At 7:22 PM, Blogger Dr Rehan said...

We have perfect capstone project ideas business specially for students. They don't need to research any more because we have done already it.

 
At 12:33 PM, Blogger Dhf India said...

Dynamic Hydrofab is an authentic and world class leading manufacturer of Hydraulic Cylinders Manufacturers India, Industrial Hydraulic Cylinders, Automotive Hydraulic Cylinder, Tipping Cylinders, Telescopic Cylinders, Tapping Machine Manufacturers, Power Pack, AC Power Pack, Compact Power Pack and Goods Lift.

To know more please visit us at: DHF. Or you can email us at: dhf@dhf.in, dhfdelhi@gmail.com.

 