Friday, March 31, 2006

Week 4

Summary: Well to start the weekend out when we went to start the car it didn't even turn over...no problem this has happend before to this car. So we connect the jumper cables and wait 5 minutes for the battery to charge. We try to turn the motor and nothing so we have to push the car around the building into the garage. First thing we do is sit down with Randy and draw up a wiring diagram. We also did a diagram of the hydraulic system. This weekend so far we installed the pump/reservoir, pump solonoid, the switches and part of the wiring. We also designed two drive shafts to be used on the idle wheels, and messed around with the sideways driving wheel.

Wiring up some switches.
Free Image Hosting at www.ImageShack.us

More wiring.
Free Image Hosting at www.ImageShack.us

Prepping the surfact to be welded.
Free Image Hosting at www.ImageShack.us

Machining a bracket for the hydraulic pump.
Free Image Hosting at www.ImageShack.us

Mounting the switch box.
Free Image Hosting at www.ImageShack.us

Our buddy Steve lays down some welds.
Free Image Hosting at www.ImageShack.us

Switch box in place.
Free Image Hosting at www.ImageShack.us

Placing the pump solonoid.
Free Image Hosting at www.ImageShack.us

Wiring the switch box.
Free Image Hosting at www.ImageShack.us

More wiring.......
Free Image Hosting at www.ImageShack.us

Hydraulic pump/reservoir and pump solonoid placement.
Free Image Hosting at www.ImageShack.us

Tubbed out back seat.
Free Image Hosting at www.ImageShack.us

Al and Randy designin shafts.
Free Image Hosting at www.ImageShack.us

0 Comments:

Post a Comment

<< Home